Similar Projects
CP2 LNG
New Construction, Infrastructure
Conception
$8,500,000,000 CJ est. value
Cameron, LA 70631

LA 82 : Mermentau Mb Rehab (G Chenier) (Hbi)
Infrastructure
Design
$7,500,000 CJ est. value
Cameron, LA 70631

LA 82 : Mermentau Mb Rehab (G Chenier) (Hbi)
Infrastructure
Design
$7,500,000 CJ est. value
Cameron, LA 70631

LA 82 : Mermentau Br - Vermillion P/L
Infrastructure
Bidding
$7,500,000 CJ est. value
Cameron, LA 70631

LA 82 : Mermentau Br - Vermillion P/L
Infrastructure
Bidding
$7,500,000 CJ est. value
Cameron, LA 70631

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Covered Basketball Pavilion for South Cameron High School
Infrastructure
Results
$639,900 CJ est. value
Grand Chenier, LA 70643

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

Delta LNG
New Construction, Infrastructure
Pending Verification
$5,000,000,000 CJ est. value
Cameron, LA 70631

LA 1143 : LA 27 - Parish Rd 216
Infrastructure
Bidding
$2,500,000 CJ est. value
Creole, LA 70632

Calcasieu River Bar Channel Hopper Dredge Contract No. 2-2020
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Cameron, LA 70631

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

Post Hurricane Restoration Project at Cameron Creole Maintenance & Livestock Pavilion LOC 59
Infrastructure
Bidding
$350,000 CJ est. value
Creole, LA 70632

Post-Hurricane Restoration Cameron Public Library
Renovation, Infrastructure
Post-Bid
$1,680,000 CJ est. value
Cameron, LA 70631

Last Updated 02/15/2024 01:34 PM
Project Title

Cameron LNG Terminal

Physical Address View project details and contacts
City, State (County) Cameron, LA 70631   (Cameron County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Paving/Reconstruction, Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $4,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of one liquefied natural gas plant, including six gas liquefaction trains and appurtenant facilities. As of February 15, 2024, construction has not started. Construction will start in the first half of 2024 on the Commonwealth LNG Liquefaction and Export Facility.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents