Similar Projects
Summerhill PA 53 Laurel Run
Renovation, Infrastructure, Alteration
Design
$1,193,798 est. value
Summerhill, PA 15958

E Glasgow Muddy Run Culvert
Renovation, Alteration
Design
$1,300,126 est. value
Fallentimber, PA

Crichton Mccormick Park Site Improvements-Paving Improvements
Post-Bid
Portage, PA

Route 403 PADOT Paving Coordination Manhole Frames and Covers
Post-Bid
Johnstown, PA 15901

Central Business District Sanitary/Storm Sewer Separation Project
Results
Johnstown, PA 15901

Demolition, Site Clearance and Site Restoration
Demolition
Results
Franklin, Hastings, Johnstown, PA

Vegetation and Sediment Removal With Concrete Repairs, Johnstown Pennsylvania
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Johnstown, PA

Hystone Avenue Sanitary Sewer Replacement Project
Infrastructure
Post-Bid
Ferndale, PA 15905

Griffiths Field CSO Abandonment Project
Results
Ebensburg, PA

Sandy Run Pressure Sewer Relocation
Infrastructure
Post-Bid
Flinton, PA

Underfloor Sewer Replacement at Ferndale Junior-Senior High School
Results
$290,000 est. value
Johnstown, PA 15905

Franklin and Portage Street Sanitary Sewer Replacement Project
Infrastructure
Post-Bid
Gallitzin, PA 16641

Demolition of Structures and Site Restoration
Demolition
Results
Franklin, PA

Cardiff Pump Station Abandonment and Utility
New Construction, Infrastructure
Post-Bid
Nanty Glo, PA

Phase 3 Site Improvements
Results
Cresson, PA

Reported 07/15/2022 12:00 AM
Project Title

Short Avenue Wastewater System Improvements - Site Improvement

Physical Address View project details and contacts
City, State (County) Cresson, PA 16630   (Cambria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site Improvement Activities involve all work incidental to the construction of improvements to a public wastewater system along Short Avenue, Township of Cresson, to include, but not be limited to, the following site improvement activities: the installation of approximately 490 L.F. of 8" PVC main, 160 L.F. of 4" laterals, 8 wyes, 3 manholes, appurtenant fittings, 50 C.Y. of test pits, paving repairs, site restoration, maintenance and protection of traffic, erosion and sedimentation control, quality control and related appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents