Similar Projects
Beatty Square Apartments
New Construction - 90,000 SF
Conception
$80,000,000 est. value
Pittsburgh, PA 15206

Kaufmann's Grand on Fifth - Parking Garage
Build-Out
Conception
Pittsburgh, PA

Forbes Avenue Mixed Use Building with Green roof.
New Construction - 313,791 SF
Design
$50,000,000 to $60,000,000 est. value
Pittsburgh, PA 15213

South Side Marina Clubhouse and Office
New Construction - 14,000 SF
Design
Pittsburgh, PA 15203

South Hills Village Rail Center Pit Restoration & Parking Garage Restoration - General Contract
Renovation
Post-Bid
$6,000,000 est. value
Pittsburgh, PA 15222

Alcosan Parking Garage
Post-Bid
Pittsburgh, PA

South Beatty and Mignonette Streets Redevelopment
Results
Pittsburgh, PA

Construction Management Services
Results
Pittsburgh, PA 15123

The Flats on Forward
New Construction - 87,000 SF
Construction
$25,000,000 est. value
Pittsburgh, PA 15217

Docking Station for Medical Mobile Equipment
New Construction
Construction
Pittsburgh, PA 15212

Strip District Real Estate
Renovation - 15,000 SF
Conception
Pittsburgh, PA 15222

West Penn Hospital Master Plan - Parking Structure
New Construction - 200,000 SF
Design
$10,000,000 CJ est. value
Pittsburgh, PA 15224

Manchester Garage Engine Test Facility - General Construction
Renovation
Results
Pittsburgh, PA 15233

Smith & Fifth
Renovation - 286,000 SF
Construction
$63,000,000 est. value
Pittsburgh, PA 15222

Shady Hill Center
New Construction - 445,200 SF
Conception
$10,000,000 CJ est. value
Pittsburgh, PA 15206

Last Updated 02/03/2020 11:19 AM
Project Title

Wood Allies Parking Garage

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15222   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project entails repair and preventive maintenance of the Wood Allies Parking Garage. Repairs include full depth stair landing slab repairs at levels 8-10, CMU wall repairs and coating, select structural steel framing repairs, fireproofing repairs, roof deck cove joint replacement, and roof deck waterproofing membrane application.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents