Similar Projects
Sheriff`s Office Evidence And Storage Facility Being Constructed
New Construction, Addition
Bidding
Raymond, IA 50667

Lew Clarkson Park Softball Complex Improvements - Phase 2
Renovation
Bidding
Johnston, IA 50131

Southeast Iowa Regional Planning Commission - Bus Storage Facility
New Construction
Post-Bid
West Burlington, IA

Road Department Equipment Storage Facility at Ventura and Thornton
New Construction
Post-Bid
Thornton, Ventura, IA 50482

Kingston Maintenance Shop
New Construction
Results
Less than $1,373,375 est. value
Cedar Rapids, IA

Holiday Park Baseball Improvements Phase 6A Maintenance Building Renovation
Renovation
Results
$190,826 est. value
West Des Moines, IA 50265

Mid American Dsm Service Center
Renovation - 119,555 SF
Construction
Des Moines, IA 50320

University Avenue Storage Expansion
New Construction
Pending Verification
Des Moines, IA 50316

Office Warehouse Building
New Construction - 9,600 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Waukee, IA

Sports Complex Improvements
New Construction, Renovation - 1,200 SF
Bidding
Winthrop, IA 50682

Marion High School Activities Complex
New Construction
Post-Bid
Marion, IA 52302

Replace Shed at Fire Station 2
Renovation
Results
Cedar Rapids, IA 52404

Amazon Warehouse
New Construction
Pending Verification
Davenport, IA

IBP Ice Center - Locker Room Addition Project
Addition
Bidding
Sioux City, IA 51106

Metal Storage Building
New Construction
Post-Bid
Maquoketa, IA 52060

Reported 03/09/2022 02:17 PM
Project Title

Vermeer Warehouse

Physical Address View project details and contacts
City, State (County) Pella, IA   (Marion County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced 2021
Bids Due View project details and contacts
Estimated Value $39,000,000 to $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A warehouse and two renovated buildings for training and to let customers/dealers try equipment.

Details

Warehouse/Storage, New Construction, 2 Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents