Similar Projects
2021 Bike Path Maintenance Program
Bidding
$25,000 est. value
Yardley, PA

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Bethlehem, Bloomsburg, Chambersburg, Clearfield, Hatfield, Hermitage, Langhorne, Latrobe, Matamoras, New Castle, Oaks, Palmyra, Philadelphia, Quakertown, Sayre, Somerset, Warren, Waynesboro, Whitehall, York, PA

Driveway/Parking Lot Improvements & Sidewalk Installation
Renovation
Post-Bid
Plumsteadville, PA 18949

Bridge Street PA DCED Multimodal Grant Pedestrian Improvement Project
Results
New Hope, PA 18938

2019 Road Improvement Program
Results
Fairless Hills, PA

Recreational Trail Extension
Post-Bid
Perkasie, PA 18944

Alumni Lane Pedestrian Plaza
Results
Doylestown, PA 18901

Concrete Sidewalk Curb Installation & Tree Trimming and Removal
Post-Bid
Bensalem, PA

Moland Park Trail: Design-Build Activities Limited to ADA Ramps
Results
$200,000 to $499,999 est. value
PA

Concrete Curb and Sidewalk Repairs
Results
Less than $18,000 est. value
Penndel, PA 19047

2020 Curb Ramp Construction Replacement Programs
Results
Bristol, PA 19007

Concrete Sidewalk and Curb Installation and Replacement
Results
Bensalem, PA 19020

2020 ADA Curb Ramp Replacement Project
Results
Hatfield, PA

Route 202 to Bradford Dam Walking Trail (Phase 1)
Results
Less than $700,000 est. value
Warrington, PA 18976

Restoration of Concrete Sidewalks, Driveways, Aprons, Curbs and Sites Affected By Water Main Breaks
Results
Levittown, PA 19055

Last Updated 12/03/2019 11:03 AM
Project Title

Keeley Avenue Sidewalk

Physical Address View project details and contacts
City, State (County) New Britain, PA 18901   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing an interconnecting sidewalk from the Borough`s planned sidewalk at Burkart Hall to Lamp Post Drive as well as sidewalk from Keeley Avenue along Sioux Road to North Tamenend Avenue.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents