Similar Projects
Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

Construct Vehicle Maintenance Shop Phase 1
LEED Certification, New Construction, Infrastructure
Bidding
$15,895,000 CJ est. value
Bloomington, IL 61701

Standard Overlay, Milled Rumble Strip New Shoulders on IL 9/ US 150
Infrastructure
Bidding
$2,000,000 CJ est. value
Bloomington, IL 61705

200,000 Gallon Elevated Water Storage Tank Rehabilitation
Renovation
Post-Bid
$200,000 CJ est. value
Lexington, IL 61753

Heartland Community College - CTE Addition and Remodel
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$300,000 CJ est. value
Normal, IL 61761

Division Street Water Main Replacement Project
Infrastructure
Results
$596,181 CJ est. value
Chenoa, IL 61726

Fort Jesse Tank Rehabilitation
Alteration
Results
Normal, IL 61761

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Bloomington and Normal Water Reclamation District (BNWRD) - Sludge Drying Bed Improvements
Infrastructure
Bidding
Bloomington, IL 61701

RFQ D/B - Fire Station 2
New Construction, Infrastructure
Post-Bid
$4,750,000 CJ est. value
Normal, IL 61761

South American Exhibit
New Construction, Renovation, Infrastructure
Results
$511,000 est. value
Bloomington, IL 61701

Construction of Saybrook Elevated Water Storage Tank
Infrastructure
Post-Bid
$390,000 est. value
Saybrook, IL 61770

2022 Township MFT Construction Sections Martin Township Road District
Infrastructure
Results
$229,144 CJ est. value
Martin Township, IL 61728

Karr Street Reconstruction
Infrastructure
Post-Bid
$1,834,395 CJ est. value
Heyworth, IL 61745

New Parking Lot at the Leroy Elementary School
Infrastructure
Post-Bid
$400,000 CJ est. value
Le Roy, IL 61752

Last Updated 09/12/2022 02:40 PM
Project Title

110,000 Gallon Standpipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Arrowsmith, IL 61722   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the interior and exterior standpipe coatings. The project is expected to be completed on or before September 30, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents