Similar Projects
Last Updated | 02/14/2022 08:57 AM |
Project Title | Police-Fire Rescue Restroom Renovations |
Physical Address | View project details and contacts |
City, State (County) | Greenville, NC 27834 (Pitt County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. First Floor Lobby Restrooms a. Remove existing countertops and replace with solid surface countertop with return and (4) under-mount sinks with (4) Sloan SF-2250 Electronic Goose Neck Faucets. Provide framing and 45° degree return to conceal plumbing. b. Remove existing flush valves and replace with Sloan G2 8110 (water closets) and Sloan G2 8180 (urinals). c. Remove wallpaper and adhesive, patch all holes and finish drywall to level 4 finish. Apply 2 coats of Sherwin Williams Pro Industrial Pre-Catalyzed Water-Based Epoxy Eggshell over compatible primer. d. Replace existing light fixtures with 5000k LED panels of the same size. d. Remove existing partitions and replace with solid plastic partitions of the dimensions. e. Remove existing mirrors and replace with (2) 24” x 36” stainless steel channel frame mirrors. f. Remove flaking paint and/or rust, prime and paint HVAC diffusers. Replace ceiling tiles with Certainteed BET 157 ceiling tiles or equivalent approved by Owner g. Remove existing ADA grab bars and replace with new items of the same dimensions 2. Police 2nd Floor Restrooms a. Remove existing countertop and replace with solid surface countertop with return and (2) under-mount sinks with (2) Sloan SF-2250 Electronic Goose Neck Faucets. Provide framing and 45° degree return to conceal plumbing. b. Remove existing flush valves and replace with (3) Sloan G2 8110 (water closets) and (1) Sloan G2 8180 (urinals). c. Remove all wallpaper and adhesive, patch all holes and finish drywall to level 4 finish. Apply 2 coats of Sherwin Williams Pro Industrial Pre-Catalyzed Water-Based Epoxy Eggshell over compatible primer. d. Replace existing light fixtures with 5000k LED panels of the same size. d. Remove existing partitions and replace with solid plastic partitions of the dimensions. e. Remove existing mirrors and replace with (2) 24” x 36” stainless steel channel frame mirrors. f. Remove flaking paint and/or rust, prime and paint HVAC diffusers. Replace ceiling tiles with Certainteed BET 157 ceiling tiles or equivalent approved by Owner g. Remove existing ADA grab bars and replace with new items of the same dimensions. 3. Fire/Rescue 2nd Floor Staff Restroom a. Remove existing sinks and replace with solid surface countertop with return and (4) undermount sinks with (4) Sloan SF-2250 Electronic Goose Neck Faucets. Provide framing and 45° degree return to conceal plumbing. b. b. Remove existing flush valves and replace with (2) Sloan G2 8110 (water closets) and (2) Sloan G2 8180 (urinals). c. Patch all holes and finish drywall to level 4 finish. Apply 2 coats of Sherwin Williams Pro Industrial Pre-Catalyzed Water-Based Epoxy Eggshell over compatible primer. Caulk around shower stalls with silicone caulk. d. Replace existing light fixtures with 5000k LED panels of the same size. e. Remove existing partitions and replace with solid plastic partitions of the dimensions. f. Remove existing mirrors and replace with (2) 24” x 36” stainless steel channel frame mirrors. g. Remove flaking paint and/or rust, prime and paint HVAC diffusers. Replace ceiling tiles with Certainteed BET 157 ceiling tiles or equivalent approved by Owner. h. Remove existing ADA grab bars and replace with new items of the same dimensions 9 4. Police 3rd Floor Restrooms a. Remove existing countertop and replace with solid surface countertop with return aand (2) under-mount sinks with (2) Sloan SF-2250 Electronic Goose Neck Faucets. Provide framing and 45° degree return to conceal plumbing. b. Remove existing flush valves and replace with (3) Sloan G2 8110 (water closets) and (1) Sloan G2 8180 (urinals). c. Remove all wallpaper and adhesive, patch all holes and finish drywall to level 4 finish. Apply 2 coats of Sherwin Williams Pro Industrial Pre-Catalyzed Water-Based Epoxy Eggshell over compatible primer. d. Replace existing light fixtures with 5000k LED panels of the same size. d. Remove existing partitions and replace with solid plastic partitions of the dimensions. e. Remove existing mirrors and replace with (2) 24” x 36” stainless steel channel frame mirrors. f. Remove flaking paint and/or rust, prime and paint HVAC diffusers. Replace ceiling tiles with Certainteed BET 157 ceiling tiles or equivalent approved by Owner g. Remove existing ADA grab bars and replace with new items of the same dimensions. 5. Colors will be determined by Owner prior to construction. 6. Paint is to be Sherwin Williams Pro Industrial Pre-Catalyzed Water-Based Epoxy Eggshell with compatible primer or equivalent approved by Owner. 7. Vendor is to provide itemized pricing by trade. 8. Work is to be completed during normal business hours. 9. Vendor is responsible for all damages caused during completion of scope of work. 10. While onsite, the Contractor and all subcontractors will maintain appropriate person conduct. No foul language, excessive noise, horseplay, smoking, etc….. will be allowed onsite. 11. Contractor is to provide a list of subcontractors intended to be used to complete the scope of work. 12. Submittals for all materials must be provided by the Contractor and approved by Owner before work can begin. 13. All materials must be delivered and available for use before work can begin. 14. Contractor is to provide operation/installation manuals and manufacturer warranty information as part of close-out documents. 15. Completion of work is to be determined by City of Greenville, NC Public Works Dept. designee. All deficient items must be corrected before work is considered complete. |
||||||||||||||||||||||||||||||||||||||||||
Details | Fire/Police Station, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |