Similar Projects
Road Widening and Reconstruction Poinciana Boulevard
Infrastructure
Design
FL

Construction of Deerwood Elementary School Sidewalk Project and Construction of Bellalago Academy Sidewalk Project
Infrastructure
Bidding
$91,364 est. value
Kissimmee, FL 34759

Construction Services for Parkway Middle School Sidewalk
Infrastructure
Bidding
Kissimmee, FL 34743

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

Design Build Push Button Contract No. 2 - Program Management
Results

Asset Maintenance - Zone 2
Results
Less than $24,990,000 est. value

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing/Safety Improvements
Results
Less than $19,911,574 est. value
FL

Downtown Revitalization Project Phase II
Infrastructure
Post-Bid
$6,000,000 est. value
Saint Cloud, FL

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

Alternative Paving Methods
Term Contract
Post-Bid
Saint Cloud, FL

Parking Lot Striping and Minor Repairs Contractor Services
Term Contract
Results
Kissimmee, FL 34744

Asphalt Repair
Results
Less than $500,000 est. value

Church Street Improvements from Mabbette Street to Main Street
Results
Kissimmee, FL 34741

Last Updated 01/12/2022 05:17 AM
Project Title

Construction Services for the Bill Beck Boulevard Extension Project

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34744   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,939,380
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a 2-lane roadway from approximately 1600 feet south of the Kissimmee Charter Academy northward to the current Bill Beck Blvd intersection on Osceola Parkway, a distance of approximately 1.13 miles. Bill Beck Blvd will initially be built as a two-lane, undivided urban roadway and was designed for future expansion to four-lanes. Construction includes sidewalk, curb & gutter, closed drainage system, provisions for street lighting and ITS (conduit and pull boxes), new signalization at the currently unsignalized Bill Beck Blvd / Osceola Parkway intersection, constructing a 225’, 2-lane bridge (continuous flat slab on pile bents) over Mill Slough, modifying the existing pond at the Kissimmee Charter Academy, removal of an existing pond serving Bill Beck Blvd, and constructing three new ponds.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents