Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CRCP, Fiber Optic Cable, and HMA
Infrastructure, Alteration
Bidding
$52,000,000 est. value
CA

Place RHMA-G (Bonded Wearing Course) and Pavement Delineation
Infrastructure
Bidding
$3,830,000 est. value
CA

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Pavement Rehabilitation
Infrastructure
Post-Bid
$268,000 est. value
San Diego, CA 92104

Cold Plane, High Friction Surface Treatment, and RHMA Paving
Infrastructure
Results
$1,580,000 est. value
CA

SB Minor B - Rehabilitate Pavement
Infrastructure
Post-Bid
$300,000 est. value
CA

El Camino Real And Cannon Road Intersection Improvements - Phase II
Alteration
Results
$325,000 est. value
Carlsbad, CA

Revise Striping and Place Rumble Strip
Infrastructure
Post-Bid
$297,000 est. value
CA

Reported 03/04/2022 12:00 AM
Project Title

Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Escondido, CA   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Construction At State Facility In San Diego County In Escondido At The Escondido Maintenance Station (5710) In District 11

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents