Similar Projects
Ambuehl Elementary School Modernization
Renovation
Bidding
$2,500,000 est. value
San Juan Capistrano, CA 92675

Newport Harbor High School Home Arts Courtyard
Renovation, Infrastructure
Bidding
$825,000 est. value
Newport Beach, CA 92663

Arterial Sidewalk Removal and Replacement at Various Locations Phase Six
Infrastructure
Post-Bid
$350,000 est. value
Anaheim, CA

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Installation Of Light Poles (Sports Field) At Pacific Drive Elementary School & Valenica Park Elementary School
Renovation, Alteration
Results
Fullerton, CA 92833

Annual Sidewalk And Curb Access Ramp Improvements
Alteration
Results
$290,000 est. value
La Habra, CA 90632

Visitors Center Plaza Renovation and Site Utility Infrastructure Upgrades
Renovation
Bidding
$5,723,000 est. value
Irvine, CA 92618

Installation of OFCI Shade Structures at Crescent Elementary School
Renovation, Alteration
Post-Bid
Orange, CA

Arbor Access Ramp
Infrastructure
Results
$250,000 est. value
Lake Forest, CA

West Parking Lot Renovation Project at Anaheim Campus
Infrastructure
Bidding
$1,050 est. value
Anaheim, CA 92801

Neighborhood Park Renovations: Sundowner and Vintage Parks
Renovation
Post-Bid
$950,000 est. value
Lake Forest, CA 92630

Asphalt Consulting Services for Bike Trail and Parks
Renovation, Infrastructure
Results
Orange, CA

Athletic Field Repair
Renovation
Bidding
$2,100,000 est. value
Los Alamitos, CA 90720

Glen Mar Frontage Road Beautification Project
Infrastructure
Post-Bid
Huntington Beach, CA 92646

Birch Park Wrought Iron Fence Project
Renovation, Alteration
Results
$150,000 est. value
Santa Ana, CA 92701

Reported 05/20/2022 12:00 AM
Project Title

New Administration Building / MPR Modernization / New Parking Lot / New Playground

Physical Address View project details and contacts
City, State (County) Buena Park, CA 90621   (Orange County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of (1) new administration building and modernization of the existing multipurpose space within the (e) multipurpose building, including the demolition of existing storefront windows and doors and installation of new storefront windows and doors; relocation of existing refrigerators and freezers; associated site work and accessible restroom upgrades.

Details

Elementary School, New Construction, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents