Similar Projects
Michael Etchison Connector - City of Monroe
Infrastructure
Conception
$1,200,000 CJ est. value
Monroe, GA 30655

Alcovy River Gravity Sewer - City of Monroe
Infrastructure
Conception
$4,000,000 CJ est. value
Monroe, GA 30655

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Natural Gas Main Relocation - Bypass
Infrastructure
Bidding
$300,000 CJ est. value
Monroe, GA 30655

Water Main Center Hill Church Road
Infrastructure
Bidding
$5,133,200 CJ est. value
Monroe, GA 30655

Rivian Phase I Grading
Infrastructure
Post-Bid
$100,000 CJ est. value
Monroe, GA 30655

Blaine Station Development
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Monroe, GA 30655

2021 LMIG Paving Project
Infrastructure
Results
$378,334 CJ est. value
Loganville, GA 30052

2021 LMIG Paving Project
Infrastructure
Results
$378,334 CJ est. value
Loganville, GA 30052

Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Social Circle, GA 30025

Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Social Circle, GA 30025

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

South Cherokee to Spring Street Tank 12" Water Main Replacement - City of Social Circle
Infrastructure
Conception
$420,000 CJ est. value
Social Circle, GA 30025

Last Updated 12/20/2023 04:04 PM
Project Title

Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $5,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new electric vehicle factory located on the North side of Interstate 20 between Highway 278, Darell Drive, and Old Mill Road, in Walton County, Morgan County, and the City of Social Circle, GA As of December 19, 2023, land agreements have been finalized which allows for vertical construction to begin, however, a timeline for construction has not been confirmed as of yet.

Details

12,000,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents