Similar Projects
Reconstruct East B Hill Road - Paving - Oxford County
Infrastructure
Conception
$250,000 CJ est. value
Newry, ME 04261

Reconstruct East B Hill Road - Paving - Oxford County
Infrastructure
Conception
$250,000 CJ est. value
Newry, ME 04261

F2T Trail Project - Phase IV and Final Phase
Infrastructure
Bidding
$200,000 CJ est. value
Norway, ME 04268

F2T Trail Project - Phase IV and Final Phase
Infrastructure
Bidding
$200,000 CJ est. value
Norway, ME 04268

Roberts Farm Preserve Sitework
Infrastructure
Post-Bid
$400,000 est. value
Norway, ME 04268

Roberts Farm Preserve Sitework
Infrastructure
Post-Bid
$400,000 est. value
Norway, ME 04268

Bridge Replacement/Located on the Harbor Road at Creek Brook Bridge
Results
Lovell, ME 04051

Durrells Mill Bridge Replacement
Results
Dixfield, ME 04224

Highway Rehabilitation
Results
Woodstock, ME 04219

Crack Sealing
Results
Carthage, Dixfield, Farmington, Phillips, Wilton, ME

Dugway Bridge Replacement
New Construction
Results
Byron, ME

2021 Roadway Paving
Infrastructure
Results
Oxford, ME

Paving
Infrastructure
Results
Hartford, ME

Coos Bridge Replacement
New Construction
Results
$554,000 est. value
Byron, ME

Hall Bridge Replacement
New Construction, Infrastructure
Results
$13,354,000 est. value
Chesterville, Dixfield, Eustis, Farmington, Wilton, ME 04936

Last Updated 09/21/2022 06:33 AM
Project Title

Replace Meadowbrook Bridge - Oxford County

Physical Address View project details and contacts
City, State (County) Norway, ME 04268   (Oxford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Meadowbrook Bridge. Project is included Oxford County FY 2021 - 2028 Budget CIP.As of September 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents