Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53715

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Portillos
Alteration
Post-Bid
Madison, WI 53719

Concrete Sidewalk at Warner Park Community Recreation Center
Infrastructure
Post-Bid
Madison, WI 53704

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Parking Lots, Curbs, and Exterior Lighting - General
Results
$570,000 est. value
Madison, WI 53718

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

Walking Path Rock Removal
Alteration
Construction
$111,240 est. value
Madison, WI 53715

Windsor Crossing
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Deforest, WI 53532

Belle Farm
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Middleton, WI 53562

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 CJ est. value
Madison, WI 53715

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (District 5)
Term Contract
Post-Bid
$1,145,000 est. value
Madison, WI

Last Updated 08/22/2022 09:43 AM
Project Title

Privately Owned Vehicle Parking Lot Reconstruction Aviation Armory Department of Military Affairs

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $326,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of removal of existing site light poles and electrical conduit, installation of new site light poles and electrical conduit, pulverize and relay of existing asphalt parking lot surface, removal of existing asphalt parking lot surface, shaping and compacting asphaltic surface base, placing hot mix asphaltic surface on approximately 4,600 SY of parking lot, removing and replacing the existing concrete driveway apron, painting parking lot stalls. Additional work includes excavating new pavement areas, site grading, as well as erosion control and site lawn restoration. Removal of excavation materials from this project will not be allowed due to considerations for the possible presence of PFAS. While PFAS is not currently regulated, directives for projects on State land is to store or re-use excavated materials on-site. In cases where this is not possible, excavated materials will be tested prior to movement off-site. Base Bid will be received for: A single lump sum bid for All Work. No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically. DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. No in-person tours will be offered. The project site has restricted access that requires a security screening process. Please contact Daniel Durig, Wisconsin Department of Military Affairs, 608-242-3859, to answer site specific questions during the bidding process.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents