Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Cured-in-Place Pipe Liner on I-172
Infrastructure
Bidding
$60,000 CJ est. value
Melrose Township, IL 62305

Cured-in-Place Pipe Liner on I-172
Infrastructure
Bidding
$60,000 CJ est. value
Melrose Township, IL 62305

Deliver and Install Liquid Bituminous Materials Asphalt
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Adams, IL 62347

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Rock Excavation on I-172
Infrastructure
Results
$500,000 est. value
Quincy, IL 62328

Construct Airport General Aviation Aircraft Apron and Roadway
Infrastructure
Results
$3,009,502 CJ est. value
Quincy, IL 62305

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Bridge Deck Sealing and Repair on the Quincy Bayview Bridge (SN 001-0068) Carrying US 24
Infrastructure
Bidding
$400,000 CJ est. value
Coatsburg, IL 62325

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Project Consists of Class a Patches
Infrastructure
Results
$349,600 CJ est. value
Pittsfield, IL 62363

North 17th - Oak to Elm
Infrastructure
Bidding
$300,000 CJ est. value
Quincy, IL 62301

Last Updated 06/07/2023 12:36 PM
Project Title

Dusty Lane Water Main Extension

Physical Address View project details and contacts
City, State (County) Quincy, IL 62301   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City Council of Quincy reserves the right to reject any or all bids and to waive technicalities. The City of Quincy's MU 019 Project consists of installing 730 feet of 6 inch water main (trenchless and trenched), 1 fire hydrant, 2 tapping valves and sleeves, and related improvements. Furnishing and installing 730 feet of 6 inch water utilizing trenched and trenchless methods, casing, one fire hydrant, tapping valves and sleeves, tree removal, seeding, and various related items Dusty Lane northeast of the intersection of North 24 th & Ellington Road north of Quincy, IL

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents