Similar Projects
Pre-Event Emergency Roadside Assistance Services
Bidding

Roadside Assistance Services
Post-Bid

100th Lane/Place Paving & Drainage
Post-Bid
$400,000 est. value
Fellsmere, FL 32948

Annual Street Resurfacing
Term Contract
Results
Less than $500,000 est. value
Vero Beach, FL 32960

Asphalt Repair
Results
Less than $600,000 est. value

Miscellaneous Construction
Results
Less than $1,000,000 est. value

58th Avenue (from North of 57th Street to 85th Street) Full Depth Reclamation
Results
Less than $7,000,000 est. value
Vero Beach, FL 32960

Resurfacing
Results
Less than $7,369,743 est. value
FL

Asphalt Repairs
Results
Less than $300,000 est. value

Annual Asphalt Repaving and Resurfacing
Term Contract
Results
Vero Beach, FL 32960

Emergency Roadside Assistance Services (I-95)
Results

Pre-Event Emergency Roadside Assistance Services (ERA) (I-95)
Results

Asset Maintenance - Zone 2
Results
Less than $24,990,000 est. value

Fellsmere Road Base Enhancements
Results
Less than $2,000,000 est. value
Fellsmere, FL 32948

C.D.B.G. Phase 7 Paving and Drainage Project - 100th Lane and 100th Place
Results
$395,580 est. value
Fellsmere, FL 32948

Last Updated 11/18/2020 09:12 AM
Project Title

Roadway Construction Expansion at Sebastian Municipal Cemetery

Physical Address View project details and contacts
City, State (County) Sebastian, FL 32958   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements at Sebastian Municipal Cemetery located at 1921 N Central Ave, Sebastian, FL 32958 will be done in two (2) phases. Phase I involves roadway construction and optional paving. Roadway Construction: 1. Stabilize soil and construct twelve (12) foot wide oval shape service road, applying 1.5” of asphalt; featuring a ten (10) foot wide stabilized outside shoulder 2. Construct roadways to meet 55’ wide turning radii Optional Pricing - Roadway Paving/Driveway Improvements 1. Surface prep and apply 1” of asphalt to entrance driveway leading from North Central Avenue to Cemetery Area #5 2. Surface prep and apply 1” of asphalt from Cemetery Area #5 to the Gazebo

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents