Similar Projects
Neighborhood Park at 159th and Quivira - PR-1875 - City of Overland Park
New Construction, Infrastructure
Conception
$2,150,000 CJ est. value
Overland Park, KS 66204

Neighborhood Park at 159th and Quivira - PR-1875 - City of Overland Park
New Construction, Infrastructure
Conception
$2,150,000 CJ est. value
Overland Park, KS 66204

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Aspen Lodge Apartments - Bldg 22
New Construction - 6,517 SF
Post-Bid
$734,857 est. value
Overland Park, KS 66204

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

2021 Crack Seal Program
Infrastructure
Results
Overland Park, KS

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

Bubble Room Coin Operated Laundry / Shawnee
Renovation, Infrastructure - 4,203 SF
Construction
$160,000 CJ est. value
Shawnee, KS 66203

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Azura Credit Union / Mission
Renovation, Infrastructure - 2,295 SF
Pending Verification
$900,000 CJ est. value
Mission, KS 66202

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

167Th & HWY Overpass Preliminary Engineering
Term Contract, Infrastructure
Post-Bid
Olathe, KS 66051

Monticello Road Improvements - 71st Terrace to 7900 Block
Infrastructure
Results
Shawnee, KS 66286

Last Updated 06/27/2023 02:23 PM
Project Title

Nall 58

Physical Address View project details and contacts
City, State (County) Mission, KS 66202   (Johnson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: 5555 W. 58th Street, Parcel ID: KP27500000 0046 5808 Nall Avenue, Parcel ID: KP27500000 0017 5818 Nall Avenue, Parcel ID: KP27500000 0018B 5822 Nall Avenue, Parcel ID: KP27500000 0018A Plans call for the construction of two, three-story buildings to include 77 residential units, 25 enclosed parking spaces, 58 surface parking spaces and 8 parallel parking spaces. The Planning Commission considered and approved the Preliminary Development Plan and Rezoning Application at the May 23rd Planning Commission Meeting. The City Council approved these items at the June 15 City Council meeting. The Planning Commission approved the Final Development Plan on August 22nd.As of March 13, 2023, construction documents have not been submitted to the City for permitting. An architect has been selected. Information regarding the selection of a general contactor has not been disclosed. No timeline for construction has been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction. Parking Spaces, 25 Parking Spaces. Parking Spaces, 58 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents