Similar Projects
Garbage and Recycling Collection Services
Term Contract
Bidding
Margate, FL

Solid Waste, Recycling, HHW, Bulk and Yard Waste Collection Services
Term Contract
Bidding
Pembroke Pines, FL

Emergency and Rapid Response Service (ERRS)
Post-Bid

Animal Carcass Removal and Disposal
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Debris Monitoring Services for Natural Disasters
Results
FL

Electronic Surplus Recycle and Disposal
Term Contract
Results
Fort Lauderdale, FL 33351

Solid Waste Services
Term Contract
Bidding
North Lauderdale, FL

Removal and Hauling of Debris From West Water Treatment Plant
Post-Bid
Miramar, FL 33027

Municipal Dredging Services
Term Contract
Results
Lighthouse Point, FL 33064

Dredging Contractor
Bidding
Fort Lauderdale, FL

Lot Clearing Sevices
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Residual Biosolids Interplant Hauling
Term Contract
Results
Sunrise, FL 33351

Recycling Services
Term Contract
Bidding
FL

Removal of Wastewater, Oil and Sludge
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Joint City Proposal for Lime Sludge Removal, Hauling and Disposal
Term Contract
Results
Tamarac, FL 33321

Last Updated 04/15/2020 09:41 AM
Project Title

Hillsboro Beach Renourishment Project

Physical Address View project details and contacts
City, State (County) Hillsboro Beach, FL 33062   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the truck haul of approximately 70,350 cubic yards of fill from Stewart Immokalee Mine or Vulcan Materials Company’s Witherspoon Mine, with placement between FDEP monuments R-6+750 to R-9+500. The elevation of the design berm for the beach fill is +7.5 ft NAVD, with a 0.5-foot tolerance. The design berm width varies along the length of the Project. The seaward design slope of the fill is 1.0 foot vertical to 10.0 feet horizontal (1V:10H), extending from the seaward edge of the berm to the existing seabed. The total Project length is approximately 2,850 linear feet.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents