Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Results
$1,800,000 to $2,000,000 est. value
Bothell, WA

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

San Souci Road Elevation Design
Infrastructure
Design
WA

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

South Lake Union the Mercer Blocks
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Seattle, WA 98109

Last Updated 05/31/2023 01:09 PM
Project Title

2023 Pavement Overlay

Physical Address View project details and contacts
City, State (County) Duvall, WA 98019   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2023 Pavement Overlay Description Of Work: The Work In This Contract Includes Edge Or Full Width Roadway Planing, Patching, Base Repairs, 2 Overlays, Striping, Utility Adjustments And Ada Ramp Retrofits For Approximately Three-quarters Of A Mile Of Roadway Between Cherry Valley Road And Big Rock Road In The City Of Duvall And Other Related Activities As Specified In The Contract Documents. This Project Is Partially Funded With Tib Funds. The Work Must Be Completed Within 60 Working Days After The Commencement Date Stated In The Notice To Proceed. Obtaining Contract Documents: The Contract Documents Are Available Through The City Of Duvalls Online Plan Room At. Contact Builders Exchange Of Washington At (425) 258-1303 Should Assistance Be Required. Bids To Remain Open: The Bidder Shall Guarantee The Total Bid Price For A Period Of 60 Calendar Days From The Date Of Bid Opening. Project Administration: All Communications Relating To The Project Shall Be Directed To The Following Project Representative Prior To The Opening Of The Bids:

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents