Similar Projects
Job Order General Construction Contracts
Bidding
Corpus Christi, TX 78401

Brentfield Elementary Additions and Renovations
Renovation, Addition
Sub-Bidding
TX 75248

Crestview Elementary School Modernizations and Improvements
Renovation, Addition
Post-Bid
Less than $4,544,500 est. value
Live Oak, TX 78233

Elementary Addition and Kitchen Renovation
Renovation, Addition
Post-Bid
Gruver, TX 79040

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Improvements at Blanton Elementary School
Post-Bid
$350,000 est. value
Austin, TX 78723

Construction of the PackĀ­age Three of the Auxiliary Gyms for Campestre, Escontrias, Hueco, H.D. Hilley, and Robert Rojas Elementary Schools
Addition - 17,584 SF
Results
Socorro, TX 79927

Multi-Campus Renovations: Warehouse, Transportation, Administration, Facility Services, and Cross Timbers Middle School Creek Remediation
Post-Bid
$2,384,047 est. value
Colleyville, TX

Multi Purpose Rooms (Group 1) - Elementary and CLC - Base Proposal
New Construction - 61,590 SF
Results
$18,300,000 est. value
Kingwood, TX 77345

Boon Elementary Renovations Project
Renovation
Post-Bid
Allen, TX 75013

Landolt Elementary School Additions and Renovations
Renovation, Addition
Results
Friendswood, TX 77546

Elementary Mini-Gyms - HVAC and Restroom Addition, Group I
Addition
Post-Bid
Brownsville, TX

Reported 05/08/2020 12:00 AM
Project Title

Designated Construction Projects

Physical Address View project details and contacts
City, State (County) Mont Belvieu, TX 77523   (Chambers County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Purcell Construction, Inc. will receive proposals for the Barbers Hill Elementary School North Classroom Additions Package 1 and Barbers Hill Elementary School South Classroom Additions Package 1. Construction budgets for each project are as follows: New Intermediate School North - $44,400,000. New Intermediate School South - $44,400,000. Elementary School North Addns - $7,000,000. Elementary School South Addns - $7,000,000.

Details

,, 440,000 SF - 1 Elementary School, 195,000 SF New Construction, 325 Acres, 1 Elementary School, 195,000 SF New Construction, 325 Acres, 1 Elementary School, 25,000 SF Addition, 1 Elementary School, 25,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents