Similar Projects
Last Updated | 11/13/2019 01:23 PM |
Project Title | F--Water Chlorine, Bldg Monitoring |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32827 (Orange County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall maintain the fully-automatic system for the safe flow-proportioned delivery of chlorine (CL) and chlorine into the LKNA CEP campus water main water supply system. The chlorine generator shall be certified to the NSF-61 standard. The CL system shall use an electrolytic cell and a single precursor, sodium chlorite (certified to the NSF-60 standard), to generate a dilute solution of chlorine on-site. As part of the system, contractor shall provide a measuring and control system capable to measure CL for continuous monitoring of chlorine concentration in water and supply a technical grade, shall conform to NSF Standard 60 certification for use in drinking water in adherence to state code requirement. Contractor shall be responsible for preparation, installation and commissioning one equipment is installed for the One-time service. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |