Similar Projects
Brandonwood Sewer Extension - City of O'Fallon
Infrastructure
Conception
$300,000 CJ est. value
O Fallon, IL 62269

Brandonwood Sewer Extension - City of O'Fallon
Infrastructure
Conception
$300,000 CJ est. value
O Fallon, IL 62269

Belleville East Creek Sewer Separation Project
Infrastructure
Design
$10,000,000 CJ est. value
Belleville, IL 62220

Belleville East Creek Sewer Separation Project
Infrastructure
Design
$10,000,000 CJ est. value
Belleville, IL 62220

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

4th Street Reconstruction
Infrastructure
Results
$1,663,811 est. value
Belleville, IL

Repair Asphalt Roads and Parking Scott AFB
Alteration
Results
$500,000 to $1,000,000 est. value
Scott Air Force Base, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Winstanley Park (Sinai Village Phase III)
New Construction, Renovation, Infrastructure - 44,122 SF
Post-Bid
$9,000,000 CJ est. value
East Saint Louis, IL 62201

Reconstruction of Shiloh Station Road From 0.4 Mile North of Johnson Road to 0.2 Mile North of Johnson Road in Shiloh
Infrastructure
Results
IL

Last Updated 08/11/2023 11:34 AM
Project Title

Reconstruction of New Continuously Reinforced Concrete Pavement, Concrete Median Barrier Wall, Portland Cement Concrete Shoulders, Grading Work, Drainage Improvements

Physical Address View project details and contacts
City, State (County) Freeburg, IL 62243   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $55,371,028 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(2.78-Mile) Reconstruction of new continuously reinforced concrete pavement, concrete median barrier wall, Portland cement concrete shoulders, grading work, drainage improvements, erosion control, pavement marking and signage installation, maintenance of traffic, construction layout, landscaping, etc. Located in the Villages of Minooka and Shorewood and the Township of Troy in various Counties. Region 1 District 1 Federal Project # NA County(S) Various Key Route(S) FAI 80 Marked Route(S) I 80 Section(S) 2021-154-R State Job #(S) C-91-105-22 Pps #(S) 1-77247-0110 Completion Date: September 30, 2025 Plus 10 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 169 - Reconstruction of New Continuously Reinforced Concrete Pavement, Concrete Median Barrier Wall, Portland Cement Concrete Shoulders, Grading Work, Drainage Improvements

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents