Similar Projects
Hollybrook Park Property Construction
New Construction
Conception
Wendell, NC 27591

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Design-Build for Founders Park Renovations
Renovation
Bidding
$785,000 est. value
Leland, NC 28451

Westwinds Park Playground Equipment
Renovation
Bidding
Lincolnton, NC 28092

2020 Poured in Place Surface Replacement at Method Community Park Playground
Post-Bid
Raleigh, NC 27601

Urinal Installation at Walnut Creek
Post-Bid
Raleigh, NC 27610

Riverwalk
Results
Less than $1,639,413 est. value
Shallotte, NC 28459

Bond Park Challenge Course Replacement
Results
Less than $315,000 est. value
Cary, NC 27513

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Albemarle Landing
New Construction
Design
$24,500,000 est. value
Charlotte, NC 28212

Midway Town Park Picnic Shelter and Gazebo
New Construction
Bidding
Winston-Salem, NC 27107

Topsail Park Gardens Project
Post-Bid
Beaufort, NC 28516

Reported 01/13/2022 12:00 AM
Project Title

Playground Improvements Jacksonville Commons

Physical Address View project details and contacts
City, State (County) Jacksonville, NC   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to, the purchase and installation of PIP - Pour in place surfacing at Jacksonville Commons Park to include brown rubber curb, removal and stockpile of sand and supply and installation of 4”stone base.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents