Similar Projects
Thermo King
New Construction - 330,825 SF
Conception
Fort Pierce, FL 34945

Pierce 1 Marina
New Construction, Build-Out - 109,650 SF
Conception
$26,174,800 est. value
Fort Pierce, FL 34950

King's Landing
New Construction - 54,000 SF
Design
$85,000,000 est. value
Fort Pierce, FL 34950

Fountain Business Center
New Construction - 19,164 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Port Saint Lucie, FL 34953

Villa Vizcaya Apartments
New Construction - 10,362,493 SF
Sub-Bidding
$10,000,000 CJ est. value
Port Saint Lucie, FL 34983

Villa Vizcaya Apartments
New Construction - 10,362,493 SF
Sub-Bidding
$10,000,000 CJ est. value
Port Saint Lucie, FL 34983

A Great Home
New Construction, Build-Out - 25,320 SF
Post-Bid
$1,000,000 est. value
Saint Lucie West, FL 34986

Amerilife
Build-Out - 2,625 SF
Post-Bid
Saint Lucie West, FL 34986

Rehabilitation of Fire Units
Term Contract
Results
$100,000 to $150,000 est. value
Fort Pierce, FL

Village on the Commons
New Construction - 101,053 SF
Construction
$35,000,000 est. value
Port Saint Lucie, FL 34986

Crownman Bed & Breakfast and Event Center
New Construction, Renovation - 13,070 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Pierce, FL 34950

Jansteel
New Construction - 69,678 SF
Pending Verification
$2,000,000 est. value
Port Saint Lucie, FL 34981

Fort Pierce RV Storage
New Construction - 415,147 SF
Pending Verification
Less than $500,000 CJ est. value
Fort Pierce, FL 34947

Kings Highway Commerce Park
New Construction, Build-Out - 1,900,000 SF
Conception
$10,000,000 CJ est. value
Fort Pierce, FL 34945

Willow Lakes - Master Plan
New Construction - 650,000 SF
Design
$595,000,000 est. value
Fort Pierce, FL 34945

Last Updated 05/25/2022 02:46 PM
Project Title

AHS Development at Tradition

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34987   (Saint Lucie County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Office
Contracting Method
Project Status Construction Commenced February 2021, Construction Complete as of April 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include seven, three story apartment buildings, 14,861 square feet each, one, three story apartment building, 11,090 square feet, 372 units total, a 4,990 square foot clubhouse, and a 126 square foot guard house.

Details

926,052 SF - 1 Office, 1 Story Above Grade, 126 SF New Construction, 8 Apartments/Condominiums, 3 Stories Above Grade, 115,117 SF New Construction 372 Unit(s), 1 Clubhouse/Social Club, 1 Story Above Grade, 4,990 SF New Construction, 16.25 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents