Similar Projects
Cooling Tower and Boiler Replacement
Bidding
Las Vegas, NV 89121

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Fume Hood
Post-Bid
Las Vegas, NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Satellite Energy Plant (SEP) Cooling Tower Repair
Post-Bid
$225,000 est. value
Las Vegas, NV

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$185,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Replace HVAC Components and Roof - Elizabeth Wilhelm Elementary
Post-Bid
$2,250,000 est. value
North Las Vegas, NV 89031

Replace HVAC Components and Roof - Dean La Mar Allen Elementary School
Post-Bid
$1,830,000 est. value
Las Vegas, NV 89121

Cooling Tower Maintenance and Repair Services
Post-Bid
North Las Vegas, NV 89121

Cooling Tower Rebuild Multiple High Schools
Post-Bid
$100,000 est. value
Las Vegas, NV

Replace HVAC Controls and Roof Fredric W Watson Elementary School
Post-Bid
$310,000 est. value
North Las Vegas, NV 89031

Last Updated 05/27/2021 09:56 AM
Project Title

UNLV CBC-C 1st and 2nd Floor Repipe

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89154   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Results
Bids Due View project details and contacts
Estimated Value $820,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and replace the hydronic piping for the CBC-C buildings 1st & 2nd Floor, according to the specifications of this project to include installation, demolition, containing, collecting, removal, and disposal of all the debris, equipment, electrical and mechanical systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents