Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Chambers Ave Roadway Construction
Infrastructure
Bidding
$900,000 CJ est. value
Park City, UT 84060

Chambers Ave Roadway Construction
Infrastructure
Bidding
$900,000 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Rossi Hill Reconstruction Project
Infrastructure
Results
Park City, UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

RFP - Highway 40 Corridor Spatial Study
Term Contract
Conception
Coalville, UT 84017

Bench Well House
New Construction, Renovation, Infrastructure
Bidding
$429,450 CJ est. value
Woodland, UT 84036

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Last Updated 06/07/2023 05:03 PM
Project Title

Main Street Storm Drain Improvements

Physical Address View project details and contacts
City, State (County) Coalville, UT 84017   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $154,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Along Main Street, between 100 S and 150 S The work includes installing approx. 550 linear feet of 18" storm drain and several inlet boxes in the existing ditch per the construction specifications. Road improvements along 150 South are also included in the proposal. Question Date 5 June 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents