Similar Projects
Plant-Wide Replacement of Electrical Cables and Utility Tunnel Bulkheads
Bidding
Newark, NJ 07105

AirTrain Newark Replacement Project
Post-Bid
$2,000,000,000 est. value
Newark, NJ 07114

South Kearny Double Track Project
Renovation
Post-Bid
Kearny, NJ

Restoration & Rehabilitation of The Lock and Lock Tender House - Lock 2 East of The Morris Canal
Results
Wharton, NJ 07885

Rehabilitation of Natirar Park Dam Borough of Peapack and Gladstone
Results
Somerville, NJ 08807

Rehabilitation of Henion Pond Dam
Construction
West Milford, NJ 07480

Waverly Loop Rail Project
Pending Verification
Newark, NJ 07105

Foundation Infrastruture Upgrades
Post-Bid
Clark, NJ

Electrification of the Deal Lake Sluice Gates
Results
Interlaken, NJ 07712

Narraticon Dam Rehabilitation
Post-Bid
Swedesboro, NJ 08085

Round Valley Reservoir Structures Refurbishment and Resource Preservation Project, Earthen Dam Rehabilitation and Ancillary Work
Results
Clinton, NJ

115 RE Running Rail for Path
Post-Bid
Jersey City, NJ

Decommisioning of Dams
Results
Bridgeton, NJ 08302

Rail Facility
Build-Out
Post-Bid
Ocean City, NJ 08226

In-Floor Train Car Hoist
Results
$5,825,000 est. value
Lindenwold, NJ 08021

Reported 02/14/2020 11:16 AM
Project Title

Hudson Tunnel Project

Physical Address View project details and contacts
City, State (County) New York, NY   (Hudson (NJ) - New York (NY) County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Dam/Tunnel, Railroad/Subway
Contracting Method Competitive Bids.
Project Status Seeking Funding, Conceptual Design
Bids Due View project details and contacts
Estimated Value $11,300,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the Project is: to preserve the current functionality of Amtrak’s NEC service and NJ TRANSIT’s commuter rail service between New Jersey and Penn Station New York (PSNY) by repairing the existing North River Tunnel; and to strengthen the NEC’s resiliency to support reliable rail service by providing redundant capability under the Hudson River for Amtrak and NJ TRANSIT NEC trains. These improvements must be achieved while maintaining uninterrupted commuter and intercity rail service. The new rail tunnel is being constructed so that NEC service can be transferred to it while the existing North River Tunnel is rehabilitated. When completed, the Preferred Alternative would result in transportation benefits, including increased reliability through improved resiliency and redundant operational capability.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Soil Treatment, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents