Last Updated 01/30/2020 11:16 AM
Project Title

Desilting of the Rahway River and Replacement of Dam Gates at Droescher's Dam and Hansel Dam

Physical Address View project details and contacts
City, State (County) Cranford, NJ 07016   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 09/26/19
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of builtup sediment within the Rahway River and the replacement of the dam gates at Droescher’s Dam and Hansel Dam within the Township of Cranford. The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of the removal of built-up sediment in the Rahway River and the replacement of the sluice gates at Droescher’s Dam and Hansel Dam. The work is located within Sperry Park along Riverside Drive and within Droescher’s Mill Park along Lincoln Avenue East within the Township of Cranford and includes: Installing four dam gates, concrete work, sediment removal, restoration, testing and proper disposal of all materials in accordance with the Township, County, NJDOT, and NJDEP standards. The work shall be completed within 120 calendar days of the Contractor’s receipt of written Notice to Proceed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents