Similar Projects
AutoZone #3618
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Tucson, AZ

O'Reilly Auto Parts (MN4)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Marana, AZ

Nike Factory Store
Build-Out - 20,101 SF
Design
Tucson, AZ 85706

Houghton Road Self Storage
New Construction, Infrastructure - 87,523 SF
Design
$20,000,000 CJ est. value
Tucson, AZ 85747

J. Crew #1144 - Casa Adobe Plaza / Tucson
Demolition, Build-out - 4,357 SF
Bidding
$165,000 CJ est. value
Tucson, AZ 85704

Lenscrafters #0374
Renovation - 4,468 SF
Post-Bid
Tucson, AZ 85705

Walmart Supercenter #5626-233 - SPRB-R
Renovation - 155,248 SF
Post-Bid
Tucson, AZ 85713

Benedictine Monastery Apartments - Phase 1
New Construction - 7,500 SF
Construction
$60,000,000 est. value
Tucson, AZ 85716

Benedictine Monastery Apartments - Phase 2
Renovation - 10,000 SF
Construction
Tucson, AZ 85716

Sixth at Campbell
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Tucson, AZ 85701

Cortaro 57
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Marana, AZ 85742

Ajo Way Restaurant and Automobile Sales
New Construction - 7,200 SF
Conception
$1,151,000 est. value
Tucson, AZ 85714

471 West Congress Street Mixed-Use
New Construction, Infrastructure - 562,199 SF
Design
$115,110,000 CJ est. value
Tucson, AZ 85701

Quatro Development
New Construction - 8,573 SF
Post-Bid
Tucson, AZ 85713

Walmart Supercenter #1291-212 - SPRB-R
Renovation - 179,529 SF
Construction
$3,264,939 est. value
Tucson, AZ 85710

Last Updated 06/27/2023 04:21 PM
Project Title

Fry's #677 Marketplace - Gladden Farms / Marana

Physical Address View project details and contacts
City, State (County) Marana, AZ 85658   (Pima County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 27, 2023, the awarded general contractor information has not been announced. Construction is expected to begin September 25, 2023. Building Only Package New building construction, 130-square-feet Complete: 33 WEEKS Please review spec section 01 6400 Kroger Direct Buy & Kroger Supplier Lists Alternate for the Electrical Wire to be purchased by GC Alternate for the Copper Piping to be purchased by GC

Details

1 Story Above Grade, 126,631 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents