Similar Projects
Combined Sewer Overflow Seperation Project
Infrastructure
Bidding
Middletown, CT 06457

On Call Air and Water Balancing Service
Infrastructure
Bidding
Stamford, CT

Valve/Gate Boxes
Post-Bid
Waterbury, CT

A.P. Hydrant Parts
Post-Bid
Waterbury, CT

Hazardville Water WICA Water Main Projects 2019
Results
$1,100,000 est. value
Enfield, CT 06082

Installation of Ductile Iron and HDPE Water Mains
Results
New Haven, CT

Furnishing Water Hydrants
Post-Bid
Hartford, CT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Line Stop and Insertion Valve Installation FY 2021
Post-Bid
Danbury, CT 06810

Public Waterline Extension, Northfield Brook Lake, Thomaston, CT
Results
Thomaston, CT

Purchase of Piping, Hydrants, Manholes, Valves, Fittings, and other Appurtenances
Term Contract
Post-Bid
Middletown, CT

Water and Sewer Repairs
Term Contract
Results
Berlin, CT

Lower Mill River Interceptor Rehabilitation - Phase 1
Post-Bid
New Haven, CT

Water Meters
Term Contract
Results
New Britain, CT

Proposed New Water Mains at Various Location
Infrastructure
Post-Bid
Norwalk, CT

Reported 09/30/2021 12:00 AM
Project Title

Advanced Metering Installation Services

Physical Address View project details and contacts
City, State (County) Watertown, CT   (Litchfield County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 09/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing all labor materials, equipment and incidentals necessary to remove existing water meters, registers, wiring and reading devices, including those in meter pits, and the installation of the new water meters, registers, wiring, and AMI modules. The Owner is purchasing the new water meters, registers and AMI Modules under a separate contract. The scope of work also includes ensuring there is adequate electrical bonding on both sides of the newly installed water meters and conducting a visual inspection of the immediate area around the newly installed water meters to determine whether a sump pump is present and whether there is proper discharge. The AMI includes installing approximately 9,844 water meters ranging from 5/8-inch to 6-inch in size, registers, radio modules.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents