Similar Projects
Westshore Plaza Master Planned Development
New Construction - 3,469,000 SF
Conception
$10,000,000 CJ est. value
Tampa, FL 33609

Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Renaissance Center VII
Build-Out - 118,808 SF
Design
Tampa, FL 33634

Tampa General Hospital Rehab Campus
New Construction - 798,000 SF
Design
$10,000,000 CJ est. value
Tampa, FL 33606

Construction, Sinkhole Grouting and Remediation Services
Infrastructure
Bidding
$2,000,039 est. value
FL

Directional Boring Services
Infrastructure
Bidding
Tampa, FL

Charles Schwab - Tampa Oaks
Renovation - 11,923 SF
Post-Bid
Temple Terrace, FL 33637

Pae Professional Services
Renovation - 1,649 SF
Post-Bid
Tampa, FL 33618

Hangar 4000/E Rehabilitation
New Construction - 14,200 SF
Results
Tampa, FL 33606

Eldridge-Wilde Wellfield Pumps and Motors Replacement Project and the Cypress Trails Property Improvements Project
Results
Odessa, FL 33556

Office & Warehouse
New Construction - 14,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tampa, FL 33613

Northwest Tampa Church of Christ
New Construction, Renovation - 14,031 SF
Construction
$2,500,000 est. value
Tampa, FL 33615

Heritage Insurance
Build-Out - 88,643 SF
Pending Verification
Tampa, FL 33607

Boutique Office Building
New Construction - 9,148 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Tampa, FL 33606

Rithm at Uptown
New Construction, Demolition
Conception
Tampa, FL 33612

Last Updated 06/21/2021 11:48 AM
Project Title

Dawning Family Services Headquarters - Phase II

Physical Address View project details and contacts
City, State (County) Tampa, FL 33604   (Hillsborough County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced January 2021, Construction Complete as of June 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include, but are not limited to, the following: demolition, stormwater management sitework, utilities sitework, paving, striping, sidewalks, fencing, landscaping, and site lighting. Must meet all Davis Bacon and Related Acts requirements. Compile U.S. Department of Labor documentation for all General Contractor, Subcontractors, Materialmen, Suppliers, etc. Copies of the detailed Request for Proposals (RFP) can be obtained via email only at info@coastalcitysolutions.com.

Details

Office, Renovation, Site Development, Renovation.
Division 01 - General Requirements, Site Construction Performance Requirements, Site Improvements Performance Requirements.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents