Similar Projects
Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

North Canadian Expansion - 12800 North Anderson Rd (Ward 7) - City of Oklahoma City
Alteration
Conception
$1,118,000 est. value
Jones, OK 73049

Utilities - US 70
Infrastructure
Design
$1,464,764 CJ est. value
Kingston, OK 73439

Utilities - US 70
Infrastructure
Design
$1,464,764 CJ est. value
Kingston, OK 73439

Bridge and Approaches SH-3
Infrastructure
Bidding
$6,576,396 CJ est. value
Antlers, OK 74523

Grade, Drain, Surface and Bridge - I-40
Infrastructure
Bidding
$88,000,000 CJ est. value
Oklahoma City, OK 73145

Dollar General / Shady Point
New Construction, Infrastructure - 10,640 SF
Sub-Bidding
$2,800,000 CJ est. value
Shady Point, OK 74956

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

Water Line Replacement
Results
McAlester, OK 74501

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Cottonwood Estates
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Oklahoma City, OK 73179

SE 104, Henney to Choctaw Rd - SE 104th St from S Henney Rd to S Choctaw Rd (Ward 4) - City of Oklahoma City
Infrastructure
Conception
$545,000 est. value
Oklahoma City, OK 73195

Last Updated 08/30/2022 02:33 PM
Project Title

Hangar Storm Sewer Improvements

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/30/2022 project was not awareded. General Improvements Add Alternate No. 1 Pipe Liner Add Alternate No. 2 New Pipe with Open Cut Trench Plans and Specifications are on file and may be examined at the office of the Ardmore Development Authority, 410 W Main St Ardmore, Oklahoma 73401 , and at the office of the Consulting Engineers, Lochner, 701 Cedar Lake Blvd., Suite 230, Oklahoma City, OK 73114 . Questions concerning the Plans and Specifications for this project should be directed to Patrick Barnas, PE at Lochner Office in Oklahoma City, Oklahoma at (405) 418- 5892 . Bid documents will be provided electronically, which will include the construction plans and specifications in Adobe Acrobat(R) PDF format accessible with Adobe Reader. The bidder will be responsible for acquiring, copying, and distributing Bidding Documents (plans and specifications) necessary to bid and construct the project. Lochner will not provide hard paper copies of the project. All bidders submitting a bid must obtain an electronic copy of bid documents from Lochner to submit a valid bid. Any proposal submitted that was obtained from an outside source other than Lochner will be considered an irregular proposal and will be eligible for rejection. When the bidder purchases a set of bid documents, the bidder will be placed on a plan holder's list which is necessary to supply bidders of any addenda that may be issued for the project. A pre bid conference will not be held for this project. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by certified check or bid bond made payable to the Ardmore Development Authority . Bids may be held by the Ardmore Development Authority for a period not to exceed ninety (90) calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as the Ardmore Development Authority may require, to reject any and all bids and to waive any informality in the bids received.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents