Similar Projects
Last Updated | 03/09/2021 09:42 AM |
Project Title | Graymoor Force Main Lining |
Physical Address | View project details and contacts |
City, State (County) | Olympia Fields, IL (Cook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $832,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed construction consists of excavating access pits, soil testing, erosion control, installing approximately 4,200 feet of cured-in-place pressure pipe in an existing 6-inch force main, providing temporary bypass pumping including approximately 200 feet of 6” HDPE directional drilling under Vollmer Road, replacement of force main as necessary to install CIPP, traffic control, restoration including landscape, pavement, curb gutter and sidewalk, and other miscellaneous items of work |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |