Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

The Vue at Clermont
New Construction
Conception
Clermont, FL

Laura Street Trio
New Construction, Renovation - 160,000 SF
Design
$165,000,000 est. value
Jacksonville, FL 32202

Atlantic 3350
New Construction - 647,925 SF
Design
$85,000,000 est. value
Pompano Beach, FL 33062

Restaurant and Dental Office
New Construction - 5,100 SF
Post-Bid
Winter Garden, FL 34777

Block 58 - Bread Building
New Construction, Build-Out - 624,026 SF
Post-Bid
$100,000,000 est. value
Hollywood, FL 33020

Development and Distribution of Real Property - Bachmann Tract
Results
Port Charlotte, FL

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

3900 Alton
New Construction - 178,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL 33140

Cornerstone
New Construction, Build-Out, Demolition - 46,120 SF
Post-Bid
$12,000,000 est. value
Jupiter, FL 33477

Publix #1223 at East San Marco
New Construction - 56,550 SF
Construction
$9,700,000 est. value
Jacksonville, FL 32207

Winter Park Square - Phase II
New Construction - 21,000 SF
Conception
Winter Park, FL

Sundy Village - Master Plan
New Construction, Build-Out
Design
Delray Beach, FL 33444

Last Updated 01/19/2022 02:05 PM
Project Title

Family Dollar #797495

Physical Address View project details and contacts
City, State (County) Steinhatchee, FL 32359   (Taylor County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced May 2021
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 1 Story Above Grade, 10,500 SF New Construction, 1 Building.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents