Project Title | Bismarck Jamestown No.2 230kV Transmission Line Stink Lake Reroute |
Physical Address | View project details and contacts |
City, State (County) | Medina, ND 58467 (Stutsman County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Roadway Lighting, Site Development |
Contracting Method | Competitive Bids |
Project Status | No longer Accepting Requests, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PN- 89503022FWA400604, 23-509882 , 23WA146832, 221181 This acquisition is 100% set-aside for Small Business Concerns. The NAICS Code for this acquisition is 237130 with a small business size standard of $45,000,000.00. The project magnitude for this acquisition is between $500,000.00 and $1,000,000.00. Refer to FAR Clause 52.204-8 on the Annual Representations and Certifications (Apr 2016) on www.SAM.gov Electronic Bids are required and shall be submitted through FedConnect ONLY. The bid opening will take place IAW the information set forth on the 1442. The opening of bids will take place virtually one day after the receipt of offers listed below in block 13. The bid opening will commence via Microsoft Teams Meeting on 28 February 2023 at 1430 CT IAW FAR 14.402-3(a)(1) and FAR 14.402-3(a)(2) 0 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |