Similar Projects
Little Elm Trunk Sewer North East Extension - City of Temple
Infrastructure
Conception
$1,400,000 est. value
Seaton, TX 76501

NW 36 Transmission Main (WTP to SH 317) - City of Temple
Infrastructure
Conception
$81,000,000 est. value
Temple, TX 76501

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Wolf Ditch Drainage Improvements
Infrastructure
Post-Bid
Killeen, TX 76541

Corrugated Metal Pipe
Infrastructure
Post-Bid
$70,000 est. value
Belton, TX 76513

Pinewood Drive Drainage Channel Scour Protection
Results
$150,000 est. value
Harker Heights, TX 76548

Greenforest Circle Drainage Improvements
Infrastructure
Results
$626,479 est. value
Killeen, TX 76543

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Valley Ditch Phase 1 - BNSF Railroad Drainage Improvements
Infrastructure
Results
TX

Water Meters
Term Contract, Infrastructure
Results
$500,000 est. value
Killeen, TX

Bartlett Housing Authority - Water Line Replacement
Infrastructure
Results
Bartlett, TX

Corrugated Galvanized Metal Culvert Pipe
Infrastructure
Results
TX

Blackland Road Extension
Infrastructure
Results
$6,100,000 est. value
Temple, TX 76502

Belton 24-Inch Low Service Pipeline Project
Infrastructure
Results
$1,900,000 est. value
Belton, TX 76513

2021 Street Utility Improvements
Infrastructure
Results
Belton, TX

Reported 06/29/2022 11:38 AM
Project Title

Bird Creek Detention Pond - City of Temple

Physical Address View project details and contacts
City, State (County) Temple, TX   (Bell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected April 2025
Bids Due View project details and contacts
Estimated Value $3,043,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bird Creek Detention Pond is a proposed on-line regional detention pond designed to provide a 4.2% reduction in flow at the confluence of Bird Creek with the Leon River. The proposed detention volume is 265-acre feet. The project is included in the city's 2022-2028 Capital Improvement Program (CIP). As of June 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents