Similar Projects
QuikTrip #4165
New Construction - 4,840 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Leander, TX 78641

Lively Tract Residential Development - Phase 4
New Construction, Infrastructure - 21,000 SF
Conception
$62,000 est. value
Georgetown, TX 78628

QuikTrip #4183
New Construction
Design
$550,000 est. value
Georgetown, TX 78628

Toyota of Cedar Park Expansion
Addition - 31,935 SF
Design
Cedar Park, TX 78613

Costco New Warehouse / Georgetown
New Construction, Infrastructure - 160,437 SF
Bidding
$13,260,000 CJ est. value
Georgetown, TX 78628

SH0045 - Bridge Repair
Infrastructure
Bidding
$750,889 CJ est. value
Round Rock, TX 78681

US0079 - Crack Seal
Infrastructure
Sub-Bidding
$316,430 CJ est. value
Taylor, TX 76574

Avilla Berry Creek Highlands
New Construction, Infrastructure - 960 SF
Sub-Bidding
$65,000,000 CJ est. value
Georgetown, TX 78628

Construction of Omega Ranch Phase 2 Subdivision Project
Post-Bid
TX

Quik Trip #4178 / Hutto
Renovation - 7,318 SF
Post-Bid
$300,000 CJ est. value
Hutto, TX 78634

TTC Land Site Clearing
Infrastructure
Results
$56,950 est. value
Florence, TX 76527

Santa Rita Ranch Phase 1, Section 10 - Street Excavation, Drainage, Water, Wastewater and Erosion Control Improvements
Infrastructure
Results
TX

HEB #01 - (Corporate Store #781)
New Construction - 121,000 SF
Construction
$10,000,000 CJ est. value
Georgetown, TX 78628

Take 5 Oil Change
New Construction - 1,500 SF
Construction
Less than $500,000 CJ est. value
Hutto, TX 78634

Loram Technologies New Office/Production Facility
New Construction, Alteration - 96,450 SF
Pending Verification
$23,000,000 est. value
Georgetown, TX 78626

Last Updated 07/29/2022 09:04 AM
Project Title

Holt Track Shop

Physical Address View project details and contacts
City, State (County) Georgetown, TX 78628   (Williamson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction is underway. Scope of Work: New heavy equipment service facility. Square Footage: 25,320 ft 2 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

25,320 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents