Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Wastewater Treatment Plant Improvements
Renovation
Bidding
$6,175,861 est. value
Jacinto City, TX

Bridgestone Municipal Utility District Wastewater Treatment Plant No. 2
New Construction
Bidding
$6,000,000 est. value
Spring, TX 77389

White Oak WWTP Catwalk Grating Replacement
Renovation
Post-Bid
TX 77282

On-Site Sludge Conveyor System Belt Modification Service
Renovation
Post-Bid
Houston, TX

North Corridor Consolidation Package 1
Results
Less than $23,837,012 est. value
Houston, TX 77000

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

AJOB Wastewater Treatment Plant Sluice Gate Replacement
Renovation
Bidding
$200,000 est. value
Houston, TX

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
TX

Construction of 2020 Wastewater Treatment Plant Improvements
Results
$1,124,200 est. value
Spring, TX 77389

Wastewater Treatment Facility Clarifier Replacement
Renovation
Bidding
$400,000 est. value
Houston, TX

Wastewater Treatment Plant Expansion
New Construction
Post-Bid
TX

HPW - Sims North WWTP Improvements
Results
$7,430,000 est. value
Houston, TX 77017

Reported 05/12/2022 10:58 AM
Project Title

Wastewater Plant Phase One

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method
Project Status Construction Commenced March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of one (1) prefabricated 0.25 MGD steel wastewater treatment plant consisting of headworks, three (3) aeration basins, one (1) clarifier, one (1) chlorine contact basin, two (2) sludge digesters, (3) positive displacement blowers, drain pad, non-potable water system, chlorine disinfection with portable eyewash station, associated piping, stairs, walkways, controls, electrical service equipment, and all necessary appurtenances. Site work including foundations for prefabricated basins, grading, crushed concrete driveway, bollards, concrete supports for pipe, swales, inlets, wood fencing, and yard piping. One (1) on-site lift station consisting of reinforced concrete wet well, reinforced concrete at-grade valve slab, submersible pumps, hatches, force main, fittings, valves, and electrical. All work shall be Complete in Place.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents