Similar Projects
Electrical Upgrades at Montclair Elementary School - Beaverton School District
Renovation
Conception
$250,000 CJ est. value
Portland, OR 97223

RFQ Contractor - McKinley Seismic /Roof General Contractor Upgrades
Renovation
Design
$3,700,000 CJ est. value
Beaverton, OR 97006

New Cornelius Elementary School - 2022 Bond - Forest Grove School District
New Construction, Infrastructure
Design
$121,900,000 CJ est. value
Cornelius, OR 97113

Beaverton High School Replacement - MEP (Mechanical, Electrical, Plumbing)
Demolition, New Construction, Infrastructure
Post-Bid
$210,800,000 CJ est. value
Beaverton, OR 97005

RFP Construction Manager - CM/GC for Raleigh Hills School Replacement
Renovation
Post-Bid
$55,000,000 CJ est. value
Portland, OR 97225

West Sylvan Classroom Addition
New Construction, Addition
Results
Portland, OR 97225

Hawksview Elementary School Additional Casework
Renovation
Results
$300,000 est. value
Sherwood, OR 97140

2022 Bond - Neil Armstrong Middle School - Forest Grove School District
Renovation
Pending Verification
$2,000,000 CJ est. value
Forest Grove, OR 97116

2022 Bond - Tom McCall Upper Elementary School Renovations - Forest Grove School District
Renovation
Pending Verification
$2,000,000 CJ est. value
Forest Grove, OR 97116

HVAC Upgrades at Southridge High School - Beaverton School District
Renovation
Design
$9,000,000 CJ est. value
Beaverton, OR 97008

RFP - HVAC Mechanical Contractors
Term Contract
Post-Bid
Beaverton, OR 97005

2022 Bond - New Classrooms and Renovations at Forest Grove High School - Forest Grove School District
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Forest Grove, OR 97116

HVAC Upgrades at Greenway - Beaverton School District
Renovation
Design
$718,000 CJ est. value
Beaverton, OR 97008

School Bathroom Remodel
Build-out
Post-Bid
$300,000 CJ est. value
Beaverton, OR 97005

HVAC Upgrades at Elmonica Elementary - Beaverton School District
Renovation
Design
$718,000 CJ est. value
Beaverton, OR 97006

Last Updated 06/30/2023 04:32 AM
Project Title

SRTS Templeton/Twality Improvements

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,667,270 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

No proposal will be considered unless fully completed in a manner provided in the RFP packet. Proposals will be considered time-stamped and received by the City when they are received in the email inbox listed above. Late proposals may not be considered, it is the City's sole discretion to accept or reject a late proposal. Proposers are required to certify nondiscrimination in employment practices and identify resident status as defined in ORS 279A.120. Pre-qualification of proposers is not required. All proposers are required to comply with the provisions of Oregon Revised Statutes (ORS) and Local Contract Review Board (LCRB) Policy. The City may reject any proposal not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all proposals upon a finding of the City if it is in the public interest to do so. Direct Questions To: Toni Riccardi, Procurement Specialist Phone: (503) 718-2518 Email: tonir@tigard-or.gov Question and Answers (Q&A) period ends Wednesday, May 31, 2023 Contact: Toni Riccardi - E-mail: tonir@tigard-or.gov The walking and biking routes for pedestrian access to Templeton Elementary School and Twality Middle School along SW Murdock Street, SW 97th Avenue, SW 96th Avenue, and SW Sattler Street are missing sections of sidewalk. Pedestrian crossings along the routes have documented safety concerns with pedestrians and cyclists. The crossings are barriers for students to walk and roll to school due to vehicle speeds, traffic volumes, and the lack of enhanced crossing treatments. This Project will make various improvements near Templeton Elementary School and Twality Middle School. Two crosswalks will receive safety enhancements including McDonald Street/Omara Street/98th Avenue and Sattler Street/96th Avenue. Sections of missing sidewalk will be constructed on 97th Avenue and Sattler Street, as well as a sidepath on Murdock Street, and a paved pathway through East Butte Heritage Park. These improvements will create a safe, accessible, and continuous pedestrian network around both Templeton Elementary School and Twality Middle School. This supports the vision statement in the City of Tigard's Strategic Plan: "Tigard: an equitable community that is walkable, healthy, and accessible for everyone."

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents