Similar Projects
Yellowstone Academy
Renovation - 3,000 SF
Design
$1,700,000 est. value
Houston, TX 77004

Cathedral High School
New Construction - 49,286 SF
Design
$19,700,000 est. value
Houston, TX 77055

Middle School No. 20
New Construction - 260,000 SF
Bidding
Less than $75,000,000 est. value
Houston, TX

2020 Leonard Brautigam Center - CTE Additions Project
Addition
Bidding
Houston, TX 77070

Construction Manager at Risk SISD Westfield HS 9th Grade Campus Additions and Renovations
Renovation, Addition
Post-Bid
Houston, TX

Agriculture Science Center - Additions and Renovations
Renovation, Addition
Post-Bid
Deer Park, TX 77536

Spring Oaks Middle School Renovation
Renovation
Results
$5,400,000 est. value
Houston, TX

Construction Manager at Risk for Memorial High School Additions and Renovations
Renovation, Addition - 140,000 SF
Results
$83,000,000 est. value
Houston, TX 77024

Waltrip High School Renovation and Addition
Construction
Less than $35,000,000 est. value
Houston, TX 77018

Presbyterian Middle School Renovation
Renovation - 22,000 SF
Construction
$2,900,000 est. value
Houston, TX 77004

Western Academy Gymnasium
New Construction - 9,122 SF
Design
$2,000,000 est. value
Houston, TX 77080

Woodland Acres Middle School Building B EIFS System
New Construction - 14,000 SF
Bidding
Houston, TX 77015

Memorial High School East Campus (Package 1)
Post-Bid
Houston, TX 77024

Renovation of Early College to Spring Leadership Academy
Renovation
Results
$2,104,720 est. value
Houston, TX 77014

South Houston High School Science Laboratary's Renovations
Renovation
Construction
Less than $2,280,000 est. value
South Houston, TX

Last Updated 02/10/2020 09:17 AM
Project Title

Construction Management at Risk Landrum Middle School Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, All Sub-Bids Received
Bids Due View project details and contacts
Estimated Value $60,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Work is estimated to be approximately $60,000,000.00 and includes phased demolishing of an existing Middle School and constructing a replacement Middle School (+/- 234,000 SF) on the same site located at 2200 Ridgecrest Drive, Houston, TX 77055. Select existing buildings may be re-used. Students will be housed on site in existing building during construction

Details

1 Middle/Senior High School, 234,000 SF Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents