Similar Projects
Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

Cured In Place Stormwater Pipe Rehabilitation
Bidding
Saint Petersburg, FL

Maintenance and Cleaning of Retention Ponds, Ditches, Swales
Term Contract
Post-Bid
Less than $50,000 est. value
FL

360 La Hacienda Drive and 319 Harbor Drive Stormwater Improvements (Q076)
Results
Less than $174,200 est. value
Indian Rocks Beach, FL 34635

Roosevelt Stormwater Facility Improvements (Pid 003130A)
Results
$2,112,021 est. value
Clearwater, FL 33755

SAN Priority Area CIPP FY20
Results
Saint Petersburg, FL 33731

SAN Annual CIPP Lining FY20
Term Contract
Results
Saint Petersburg, FL 33731

Drainage Repair
Results
Less than $1,000,000 est. value

2021 Stormwater Pipe Cleaning
Term Contract
Results
Less than $500,000 est. value
Clearwater, FL 33758

2021 Stormwater Repairs
Term Contract
Results
$1,000,000 est. value
Clearwater, FL 33755

2021 Underdrains
Results
Less than $350,000 est. value
Clearwater, FL 33755

Intent to Utilize City of Largo Contract for Sewer and Stormwater Rehabilitation
Term Contract
Results
Largo, FL 33770

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

Bartlett Park and 7th Street South Stormwater Improvements
Results
$2,234,000 est. value
Saint Petersburg, FL 33705

San Salvador Drive and St. Catherine Drive West Street Improvement Project
Results
Less than $808,523 est. value
Dunedin, FL 34698

Last Updated 09/15/2020 08:22 AM
Project Title

2021 Stormwater Pipe Lining Project

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33755   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An annual on-call services contractto provide all labor, equipment, and materials for storm water pipes cleaning and repairs. The various items shall be performed in accordance with City of Clearwater specifications and in conformity with the existing line, grade, and dimensions. Pre-Qualification Amount: $1,000,000.00

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents