Last Updated | 11/07/2019 01:02 PM |
Project Title | Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72) |
Physical Address | View project details and contacts |
City, State (County) | FL (Sarasota County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $12,092,815 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project to be bid on is located in Sarasota County. The Project is generally described as the construction of a five mile long regional potable water transmission main carrying potable water. The pipeline route is generally from the terminus of the Authority’s Phase 3A transmission main adjacent to Sarasota County’s Central County Solid Waste Disposal Complex to a new delivery point for Sarasota County on Clark Road/State Road 72. The Project includes the following work: • Construction of approximately four (4) miles of 48-inch diameter and one (1) mile of 36-inch diameter potable water transmission main. • An interconnection to an existing potable water transmission main. • Construction of a new valve assembly and future meter station near the northerly terminus of the 36-inch potable water transmission main. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |