Similar Projects
Fire Line Backflow Services
Term Contract
Bidding
FL

Fairways of Capri Isles Water Main Improvements
Bidding
$600,000 est. value
Venice, FL

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Unit Price Contract for Small Pipeline
Term Contract
Post-Bid
Less than $5,000,000 est. value
Sarasota, FL 34230

Valve Replacement Program – Phase 13
Results
Less than $125,000 est. value
Venice, FL 34285

Hillview Forcemain Extension and Midnight Pass Watermain Replacement
Results
$375,146 est. value
Sarasota, FL 34230

Nokomis Sewer Phase II
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Bayfront Park AC Water Main Replacement Siesta Drive AC Water Main Replacement 7
Results
Sarasota, FL 34236

Turtle Rock-McIntosh Reclaimed Water Main
Results
$503,593 est. value
Sarasota, FL 34230

Myakkahatchee Creek Water Treatment Plant to Ortiz Water Main
Results
North Port, FL

South Biscayne Drive and Pan American Boulevard Bridge Pipeline Replacements
Results
$538,357 est. value
North Port, FL 34287

Peace River Water Main Interconnect
Results
$17,786,340 est. value
Sarasota, FL 34230

San Mateo Potable Water Main
Results
North Port, FL 34286

Water Distribution System Improvements
Results
Less than $509,389 est. value
North Port, FL

Last Updated 11/07/2019 01:02 PM
Project Title

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)

Physical Address View project details and contacts
City, State (County) FL   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,092,815
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to be bid on is located in Sarasota County. The Project is generally described as the construction of a five mile long regional potable water transmission main carrying potable water. The pipeline route is generally from the terminus of the Authority’s Phase 3A transmission main adjacent to Sarasota County’s Central County Solid Waste Disposal Complex to a new delivery point for Sarasota County on Clark Road/State Road 72. The Project includes the following work: • Construction of approximately four (4) miles of 48-inch diameter and one (1) mile of 36-inch diameter potable water transmission main. • An interconnection to an existing potable water transmission main. • Construction of a new valve assembly and future meter station near the northerly terminus of the 36-inch potable water transmission main.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents