Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

I-70 EB Amaranth to Bdfrd
Infrastructure
Bidding
$25,000,000 CJ est. value
Crystal Spring, PA 15536

I-70 EB Amaranth to Bdfrd
Infrastructure
Bidding
$25,000,000 CJ est. value
Crystal Spring, PA 15536

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

13,479 SY Double Sealcoat with RS-2PM (E- 2M)/CRS-2PM (E-3M)
Infrastructure
Post-Bid
Warfordsburg, PA

23SC-SGL 53 Meadow Grounds Road Project
Infrastructure
Results
$193,176 est. value
PA

Bridge Repairs
Renovation, Infrastructure
Results

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

US 522 - Franklin Co Line
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
PA

SR 1001 - SR 1002 to PA 16
Infrastructure
Conception
$2,201,830 est. value
PA

Last Updated 01/11/2023 01:36 AM
Project Title

Sipes Mill Bridge

Physical Address View project details and contacts
City, State (County) Needmore, PA 17238   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $1,582,050 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On Sipes Mill Road (SR 3013) over Little Tonoloway Creek near the intersection of Black Bear Road (SR 4003) in Belfast Township, Fulton County. As of January 11, 2023, the project is in development stage. Anticipated letting date is January 29, 2026. PennDOT - Sipes Mill Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents