Similar Projects
WLTP Ramp Replacement
Bidding
$20,000 est. value
Westwood, MA 02090

Tremont Street Pedestrian and Cyclist Improvements
Bidding
Boston, MA

Parking Access and Revenue Control System at Worcester Regional Airport
Term Contract
Post-Bid
Worcester, MA 01602

Asphalt Paving and Sidewalks
Post-Bid
$60,000 est. value
Medway, MA

Walkway Repairs, Hillside Gardens 667-1
Results
$39,000 est. value
Gardner, MA 01440

Crescent Street Sidewalk Improvements
Results
$200,000 est. value
West Boylston, MA 01583

Pointe Place Parking
Pending Verification
Dover, MA

Capital Improvement Project 21-22 Tremont Street Pedestrian and Cyclist Improvements
Bidding
Boston, MA

Western Massachusetts Hospital Sidewalk Replacement Project II
Post-Bid
Less than $59,113 est. value
Westfield, MA 01085

Y--631-17-002 Exterior Site Improvements
Results
$5,000,000 to $10,000,000 est. value
Leeds, MA 01053

Shared Streets Pedestrian Improvements Project
Bidding
Less than $200,000 est. value
Southbridge, MA

Asphalt Sidewalks at Lovering Height
Post-Bid
Medway, MA 02053

Sidewalk and ADA Improvements at Various Locations
Results
Less than $416,336 est. value

Lake Wallace Sensory Trail
Bidding
$142,000 est. value
Greenfield, MA

Boardwalk Milford Street
Post-Bid
Less than $150,000 est. value
Medway, MA 02053

Last Updated 07/29/2020 10:04 AM
Project Title

Pedestrian and Bicycle Improvements at Various Locations

Physical Address View project details and contacts
City, State (County) (Franklin, Hampden, Hampshire, Norfolk, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,914,980
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"0.250","a","Clearing And Grubbing","101." "10.000","Ea","Tree Protection – Armoring & Pruning","102.511" "2000.000","Cy","Unclassified Excavation","120.1" "70.000","Cy","Test Pit For Exploration","141.1" "100.000","Cy","Ordinary Borrow","150." "1000.000","Cy","Gravel Borrow","151." "7000.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "6.000","Ea","Catch Basin","201." "2.000","Ea","Gutter Inlet","204." "10.000","Ea","Drainage Structure Adjusted","220." "2.000","Ea","Drainage Structure Change In Type","220.3" "10.000","Ea","Sanitary Structure Adjusted","220.7" "100.000","Cy","Removal Of Drainage Structure Sediment","227.3" "100.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "20.000","Ft","12 Inch Drainage Pipe - Option","234.12" "5.000","Ea","12 Inch Drainage Pipe Flared End - Option","235.12" "5.000","Sy","Sidewalk Flume","280.15" "10.000","Ea","Gate Box Adjusted","358." "10.000","Ea","Service Box Adjusted","381.3" "24000.000","Sy","Pavement Fine Milling","415.2" "2550.000","Ton","Superpave Surface Course – 9.5 (Ssc – 9.5)","450.22" "300.000","Ton","Superpave Leveling Course - 12.5 (Slc - 12.5)","450.53" "100.000","Ton","Hma For Patching","451." "1200.000","Gal","Asphalt Emulsion For Tack Coat","452." "6000.000","Ft","Hma Joint Sealant","453." "50.000","Ton","Hot Mix Asphalt Berm, Type a","470." "100.000","Ton","Asphalt Mixtures For Temporary Work","472." "10000.000","Ft","Milled Rumble Strip For Bicycle Traffic","477.1" "2250.000","Ft","Granite Curb Type Va4 - Straight","504." "750.000","Ft","Granite Curb Type Va4 - Curved","504.1" "5.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "450.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "100.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "5.000","Ea","Granite Curb Corner Type a","516." "2200.000","Ft","Curb Removed And Reset","580." "200.000","Ft","Curb Removed And Discarded","594." "50.000","Ea","Silt Sack","697.1" "1400.000","Sy","Cement Concrete Sidewalk","701." "275.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "500.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "2175.000","Sy","Liquid Penetrant/Sealer","701.3" "750.000","Ton","Hot Mix Asphalt Walk Surface","702." "60.000","Ton","Hot Mix Asphalt Driveway","703." "2.000","Ea","Park Bench","707.1" "2.000","Ea","Park Bench Removed And Reset","707.15" "5.000","Ea","Bicycle Rack","707.9" "10.000","Ea","Rural Mail Box Removed And Reset","715." "2.000","Ea","Mail Box Removed And Reset","715.1" "1.000","Ls","Equipment For Engineers Field Office","747." "400.000","Cy","Loam Borrow","751." "3500.000","Sy","Seeding","765." "7500.000","Ft","Sediment Control Barrier","767.121" "5.000","Ea","Pull Box Adjusted","811.35" "5.000","Ea","Electric Handhole Adjusted","811.37" "200.000","Ft","Wire Loop Installed In Roadway","819.831" "4.000","Ea","Rectangular Rapid Flashing Beacon (Ac Power)","824.21" "4.000","Ea","Rectangular Rapid Flashing Beacon (Solar)","824.22" "150.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "10.000","Ea","Reflectorized Flexible Delineator Post (Amber)","834.17" "250.000","Ea","Reflectorized Flexible Delineator Post (White)","834.18" "15.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "40.000","Hr","Roadway Flagger","850.41" "300.000","Day","Traffic Cones For Traffic Management","851.1" "160.000","Sf","Safety Signing For Traffic Management","852." "500.000","Ft","Temporary Pedestrian Barricade","852.11" "50.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "100.000","Day","Truck Mounted Attenuator","853.403" "100.000","Day","Temporary Illumination For Work Zone","853.8" "15000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "15000.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "5000.000","Sf","Pavement Marking Removal","854.1" "100.000","Day","Arrow Board","856." "100.000","Day","Portable Changeable Message Sign","856.12" "300.000","Day","Reflectorized Drum","859." "100.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "1400.000","Sf","Pavement Arrows And Legends Reflectorized White (Thermoplastic)","864.04" "2500.000","Sf","High Friction Surface Coating (Colored)","864.1" "42000.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "7000.000","Ft","12 Inch Reflectorized White Line (Polyurea) (Recessed)","866.212" "10000.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "2000.000","Ft","12 Inch Reflectorized Yellow Line (Polyurea) (Recessed) ","867.212" "16.000","Ea","Traffic Sign Removed And Reset","874.2"

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents