Similar Projects
Spot Patching / Pavement Repair - D06 SP FY21 Priority
Bidding
OH

Groveport Madison Asphalt and Concrete Replacement Phase 2
Bidding
OH

Paving Improvements
Post-Bid
Hilliard, OH 43228

Harlem Road Leisure Path Greensward Road to Dublin Granville Road
Post-Bid
Less than $340,000 est. value
New Albany, OH 43054

Fix It - Indefinite Quantity Contract - Asphalt Paving
Results
Less than $2,900,000 est. value
Columbus, OH

2019 Street Improvements
Results
Less than $805,000 est. value
Bexley, OH 43209

Resident Pad and Entrance Road Improvements Project
Bidding
Grove City, OH 43123

Prairie Township Sports Complex Entrance Phase 2 and Roadway Widening
Post-Bid
Less than $764,000 est. value
Columbus, OH 43085

District Pavement Improvements - Summer 2019
Results
Less than $417,621 est. value
Dublin, OH

Hudson Street Utility Relocation
Bidding
Columbus, OH 43227

Avery Road and Rings Road/Cara Road Interim Intersection Improvement
Post-Bid
Dublin, OH

Intersection - IR 71 Ramp/Silver at Hudson
Results
Columbus, OH 43004

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

O`Shaughnessy Reservoir Asphalt Repairs
Post-Bid
Columbus, OH

Four Lane Resurfacing - IR-IR 670-03.88
Results
Columbus, Gahanna, OH 43230

Last Updated 04/06/2021 04:23 PM
Project Title

Improvement of Toy Road, Swisher Road, Saltzgaber Road and Groveport Road Improvement Part 1 and 2

Physical Address View project details and contacts
City, State (County) Groveport, OH 43125   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,739,346
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

EBE Goal: 6% Part 1-The project involves a roadway widening plan for Groveport Road for approximately 0.34 miles and Saltzgaber Road for approximately 0.48 miles. The typical section for Saltzgaber Road will be 3 lanes with a two-way left turn lane along the majority of the alignment. Groveport Road widening includes an eastbound left and eastbound right turn lane along with a westbound left turn lane. The project will also improve drainage. Part 2-Improve Toy Road with dual cul-de-sac east of the intersection of Centerpoint Parkway. Resurface the remaining Toy Road and Swisher Road and part of Saltzgaber Road with 1.5" asphalt overlay. Improve drainage and install traffic control items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents