Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Rose Pioneer Elementary Technology
New Construction
Post-Bid
Holly, MI 48442

2019 Bond Bid Package 5B
Renovation
Post-Bid
Novi, MI 48374

Construction Management Services
Results
Clawson, MI

Orchard Hills Elementary Remodeling and Village Oaks Elementary Remodeling
Renovation
Results
Novi, MI 48374

Waterford Montessori Academy, Elizabeth Lake Campus - Building Addition
Addition - 21,628 SF
Construction
Waterford Township, MI 48328

ATAP Early Childhood Gymnasium and Classroom Renovations
Renovation - 9,691 SF
Construction
$700,000 est. value
Pontiac, MI 48341

Novi Meadows Elementary School
New Construction
Post-Bid
Novi, MI

2018 Bond Program - Stadium Drive Elementary Secure Entry
Results
Orion, MI 48360

2022 Renovations Elementary School
Renovation
Post-Bid
Farmington, MI

Pierce Elementary School Improvements 2020 Bond Bid Package1.1
Results
Birmingham, MI 48009

Elementary Schools Additions and Remodeling
Renovation, Addition
Post-Bid
Highland, MI

New Construction-Dublin Elementary
Renovation
Results
Walled Lake, MI

2019 Bond Projects - Bid Package 5
Renovation
Post-Bid
Commerce, West Bloomfield, Wixom, MI 48324

Reported 06/17/2022 10:17 AM
Project Title

Scripps Elementary School - Lake Orion Community Schools

Physical Address View project details and contacts
City, State (County) Orion Township, MI 48360   (Oakland County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected June 2022, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Lake Orion, Michigan. Working plans call for the renovation of a educational facility. As of December 8, 2020, this project has not started construction. This project is in a later phase of the bond and the planning process has not begun. A construction manager and architect have been selected. Series 2 - 2018 Bond Project The scope work has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents