Similar Projects
Last Updated | 05/11/2021 10:35 AM |
Project Title | National Ground Intelligence Center (NGIC) Secure Operations and Admin Facility, Rivanna Station Virginia |
Physical Address | View project details and contacts |
City, State (County) | Charlottesville, VA (Albemarle County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Parking Garage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct an Secure Operations and Administration Facility (SOAF) Addition and multilevel parking structure. Addition will extend the secure boundary of the existing Nicholson building, and include critical laboratory spaces on the first two levels, with workstations and meeting areas on the third level that are structured to accommodate mission, collaboration and training either in a secure or non-secure environment. The addition will tie into the 2nd, 3rd and 4th levels of the existing facility, and include raised access flooring, elevators and restrooms, a fire detection system, fire suppression systems, and mechanical systems that are independent but tied into the existing Nicholson building systems chiller and EMCS. A temporary SCIF boundary wall will be constructed on the connections to the existing facility to keep the existing SCIF accreditation prior to connections from the new addition. Electrical power for the addition will be provided with electrical power from an expansion of the existing building switchgear, and include redundant standby generators and a UPS system for the SCIF information technology center. The building will be designed to comply with TEMPEST standards and accommodate AT/FP requirements including design for progressive collapse. Rock excavation is included to make the addition possible using a cantilever design to reduce construction costs. Supporting facilities will include electric, water and gas distribution, sanitary and storm water drainage systems on and offsite. The parking structure will be built over existing on-grade parking to minimize the amount of additional parking that needs to be provided - 250 additional spaces will be provided on two levels. |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Misc. Buildings, 80,800 SF Addition, 1 Parking Garage, 4 Stories Above Grade, New Construction Building.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |