Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

Storm - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$2,303,000 CJ est. value
Highland Park, IL 60035

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Grand Avenue Car Wash Redevelopment
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Gurnee, IL 60031

RFQ Engineering - Phase III Construction Engineering Services for the Telegraph Road Improvement Project
Infrastructure
Bidding
$622,000 CJ est. value
Bannockburn, IL 60015

RFQ Engineering - Phase III Construction Engineering Services for the Telegraph Road Improvement Project
Infrastructure
Bidding
$622,000 CJ est. value
Bannockburn, IL 60015

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1
Infrastructure
Results
$6,227,127 CJ est. value
Island Lake, IL 60042

Site Improvements
Infrastructure
Results
Vernon Hills, IL 60061

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

2022 Street Resurfacing
Infrastructure
Construction
$480,000 CJ est. value
North Chicago, IL 60064

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

U-Haul / Mundelein
New Construction, Infrastructure - 33,800 SF
Pending Verification
$3,500,000 CJ est. value
Mundelein, IL 60060

Streets - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$1,620 CJ est. value
Highland Park, IL 60035

Last Updated 08/12/2023 01:01 AM
Project Title

Consist of Removing Reflectors, Placing New Reflectors

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,279,775 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed in various routes throughout Lake County. Region 1 District 1 Federal Project # N/A County(s) Lake Key Route(s) Various Marked Route(s) Section(s) Lake State Job #(s) M-60-008-24 PPS #(s) 0-01837-1002 Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 112 - Consist of Removing Reflectors, Placing New Reflectors M-60-008-24

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents