Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Design-Build Floating Day Dock and Dinghy Dock
Bidding
Bradenton Beach, FL 34217

CT5 Mooring Improvements
Bidding
$2,000,000 est. value
Cape Canaveral, FL 32920

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Trout River Floating Dock Demolition
Results
Less than $56,060 est. value
Jacksonville, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

Replacement of Seawall and Boardwalk at Strickland Park (Hudson Beach)
Bidding
Hudson, FL 34667

Black Point Marina - Dock Reconstruction
Post-Bid
Less than $804,000 est. value
Homestead, FL 33032

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

Dock Demolition at the Jupiter Inlet Lighthouse Outstanding Natural Area
Bidding
Jupiter, FL

Wharf and Wall Repairs
Post-Bid
Palmetto, FL 34221

Last Updated 04/26/2021 03:13 AM
Project Title

Mole Pier Boat Wash Facility

Physical Address View project details and contacts
City, State (County) Key West, FL   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of providing all site work, materials, equipment, and labor necessary for the construction of a boat wash facility at the Navy Mole Pier. The facility consists of a double-bay concrete pad which includes a floor drain, underground electrical and plumbing, lighting, oil-water separator, two shower poles and two Hydro Blaster (or equal) pressure washers. The floor drain will first gravity flow through an oil water separator and then through nearby sanitary sewer during use or to an adjacent detention pond when not in use.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents