Similar Projects
Last Updated | 09/29/2020 12:43 PM |
Project Title | August Drive Bridge Sheet Pile Walls Replacement at Dames Point Marine Terminal |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL 32099 (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,300,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project work shall be inclusive of yet not limited to all labor, materials, equipment, incidentals, testing and supervision necessary to replace the abutment steel sheet pipe walls, approach slabs, and bulkhead caps, and to install a new cathodic protection system, at the August Dr. Bridge (Dames Point Marine Terminal, Cruise Terminal). Main activities for this project shall include but are not limited to: implementation of environmental protection measures, replacement of approach concrete slabs, replacement of bulkhead concrete caps, replacement of steel sheet pile walls, installation of soil anchors, installation of cathodic protection system, installation of traffic railing, milling, striping, and paving. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |