Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville
New Construction, Infrastructure - 1,200,000 SF
Design
$129,600,000 CJ est. value
Plainfield, IL 60544

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Resurfacing With Hot-Mix Asphalt Binder and Surface Courses
Infrastructure
Results
$179,076 est. value
Lockport, IL 60441

RR-21-4583R Weigh-In-Motion Replacement
Infrastructure
Results
Homer Glen, IL 60491

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

87th St. Bridge Over Springbrook Creek - BR019 - City Of Naperville
New Construction, Infrastructure
Conception
$1,734,000 CJ est. value
Naperville, IL 60564

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

Trucking, Traffic Control, Electrical, Concrete and Asphalt Paving
Infrastructure, Alteration
Post-Bid
Joliet, IL

Messenger Marsh Asphalt Trail Reconstruction
Infrastructure
Results
Homer Glen, IL 60491

Farnsworth Avenue Bridge Phase III - City of Aurora
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Aurora, IL 60503

Last Updated 06/20/2023 02:38 AM
Project Title

Rehabilitate Aircraft Parking Apron Pavements, Phase 3 & 4

Physical Address View project details and contacts
City, State (County) Bolingbrook, IL 60490   (Will County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate Aircraft Parking Apron Pavements, Phase 3 and 4 Region 1 District 1 Federal Project # 317SBGPTBD County(S) Will IL Project # 1C5 4916 Airport Bolingbrook's Clow International Sponsor Village of Bolingbrook City Bolingbrook The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. 120 Calendar Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 05A - Rehabilitate Aircraft Parking Apron Pavements, Phase 3 and 4

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents